Architectural Modifications

Living in an HOA helps protect your investment and maintain the look and feel of the neighborhood.
 
At Espada, any changes or additions to the exterior of your home must be reviewed and approved by the Architectural Control Committee (ACC) before work begins.
 
Major projects, like adding a patio or storage building, require a review fee. Smaller updates, such as painting or landscaping, only require an application with no fee.
 
The ACC has up to 30 days to review each submission. If additional information is needed, a team member will reach out, and final decisions will be shared by email within that timeframe.
 
If you have any questions or need assistance, please contact bryana.santiago@ccmcnet.com.
 

What Requires Pre-Approval

Examples of exterior projects that require ACC Committee Review:
  • Painting the exterior or trim
  • Installing security cameras
  • New front door or screen
  • Redesigning or installing landscaping, irrigation, and/or lighting
  • Constructing a fence, wall, and/or gate
  • Adding a secondary structure, such as a shed
  • Installing solar panels or a satellite antenna
If you want to stain your fence or install a trash screener, please review the pre-approved stains and project dimensions: 

ACC Application Forms and Required Materials

Submitting a complete ACC Application is the best way to have a smooth, efficient process. Every application must include: 
  • A completed ACC Application. Submitted online, by email, or in person at the HOA Office. 
  • A Lot survey annotated to detail the exterior changes you are making on your lot. 
    • Your lot survey is with your closing documents. 
  • Additional details such as color swatches, contractor information, and more may be needed depending on your project. 
ACC Application: 

How to Submit an Application

  1. Access the ACC Application. The HOA offers a digital and paper copy for your convenience. 
  2.  Provide the Following Project Information:
    • Lot Survey: A copy of the lot survey (included with your closing documents) showing the proposed location of the project.
    • Project Dimensions and Elevations: Diagrams or drawings that clearly show the size and height of the project.
    • Materials Description: A list of the materials that will be used.
    • Color Information (if applicable): Include brand names and specific color names or numbers.
    • Submit Payment (if applicable): Mail or drop off the required check to the designated address
  3. The design review board shall have up to 30 days to review and respond to any completed submittals. An approval or denial letter will be emailed/mailed to the Homeowner’s address on file.
  4. Work must be completed within 12 months from the date of the approval. When the work is complete, please email your Community Manager, Bree Santiagol, at Bryana.Santiago@ccmcnet.com, reporting the completion of the project. If the approved work is not completed within 12 months, another design review application must be submitted and approved.